1: Date 10/02/2006 |
2: Time 1800 |
3: Initial | Update |
Final | XX | |
4: Incident
Number CA-LPF-2023 |
5: Incident
Name DAY |
6: Incident Kind Wildland Fire |
7: Start Date
Time 09/04/2006 1355 |
8: Cause Human |
9: Incident Commander M.Dietrich and G. Custer |
10: IMT Type 1 |
11:
State-Unit CA-LPF |
12: County Ventura |
13: Latitude and Longitude Lat: 34° 36´ 10" Long: 118° 47´ 43" Ownership: CA-LPF |
14: Short Location Description (in reference to
nearest town): SW of Pyramid Lake @ Piru Creek |
Current Situation |
15:
Size/Area Involved 162,702 ACRES |
16: % Contained or
MMA 100 Percent |
17: Expected Containment Date: 10/02/2006 Time: 1800 |
18: Line to Build 0 Miles |
19: Costs to Date $73,505,408 |
20: Declared Controlled Date: Time: |
21: Injuries this Reporting Period: |
22: Injuries to Date: |
23: Fatalities | 24: Structure Information | |||
0 | 7 | 0 | Type of Structure | # Threatened | # Damaged | # Destroyed |
25: Threat to Human
Life/Safety: Evacuation(s) in progress ---- No evacuation(s) imminent -- XX Potential future threat -------- No likely threat --------------- XX |
Residence | 1 | 1 | |||
Commercial Property | 0 | |||||
Outbuilding/Other | 3 | 10 |
26: Communities/Critical Infrastructure Threatened (in 12, 24,
48 and 72 hour time frames): 12 hours: 24 hours: 48 hours: 72 hours: |
27: Critical Resource Needs (kind & amount, in
priority order): 1. 2. 3. |
28: Major problems and concerns (control problems,
social/political/economic concerns or impacts, etc.) Relate critical
resources needs identified above to the Incident Action
Plan. The use of minimum impact suppression tactics (MIST) in wilderness and threatened/endangered species habitat. Protection of heritage resources. Prevention of the spread of the New Zealand mud snail north of Pyramid Dam and into Piru Lake. |
29: Resources threatened (kind(s) and
value/significance): Wilderness values in the Sespe Wilderness and Chumash Wilderness on the Los Padres National Forest. California Condor Sanctuary and habitat. Arroyo toad and California red-legged frog habitat. Sespe River Steelhead habitat. |
30: Current Weather Conditions Wind Speed: 5G15 mph Temperature: 65-75 Wind Direction: SW Relative Humidity: 45-55 |
31: Resource
benefits/objectives (for prescribed/wildland fire use
only): |
32: Fuels/Materials Involved:
4 Chaparral (6 Feet) Heavy mixed brush with scattered timber. |
33: Today's observed fire behavior (leave blank for
non-fire events): East/West: Minimal fire behavior due to increased moisture and suppression activity. Interior smoldering and occasional flare-ups where fuels persist. Lower indices, ridge top winds WSW 6-12 with gusts up to 55. |
34: Significant events today (closures, evacuations,
significant progress made, etc.): East/West Mop up continues in Lockwood Valley area and Piru. Significant demob in process. Continue rehab of contingency line and lines within the burn. |
Outlook |
35: Estimated Control Date and Time: |
36: Projected Final Size: |
37: Estimated Final Cost: |
38: Tomorrow's Forecasted Weather Wind Speed: 5 mph Temperature: 45-55 Wind Direction: SW Relative Humidity: 80-90 |
39: Actions planned for next operational
period: East/West: Continue determining rehab needs and continue implementing the rehab plan. Patrol/mop-up direct line from Lockwood flat east to Gold Hill and west to dozer line. Patrol/mop-up direct line east to west Piru Creek at Gold Hill Road. Mop in on divisions. Continue back hauling equipment and supplies out of the fire area. |
40: Projected incident movement/spread during next
operational period: No movement /spread expected. |
41: For fire incidents, describe resistance to control in terms of: |
1. Growth Potential - Low |
2. Difficulty of Terrain - Extreme |
42: How likely is it that containment/control
targets will be met, given the current resources and suppression/control
strategy? Highly likely, Containment of 100 percent as 10/2/2006 at 1800 |
43: Projected demobilization start date: 09/25/2006 1200 |
44: Remarks: The Day Incident is under Area Command (Waterbury) with Type I Team (Custer) managing the East Zone and CIIMT-5 (Dietrich) managing the West Zone. Transition with CIIMT-1 (Feser) to replace CIIMT-5 (Dietrich) will take place on 10/03/2006 at 1800. The Day Incident Summary 209 will reflect both the East and West Zone. Helicopter accident occurred yesterday at the Rose Valley Retardant Helibase. Pilots sustained minor injuries and were transported to Ojai Valley Hospital for further observation. |
45: Committed Resources (Supplemental Committed Resources follow the first block) |
Agency | CRW1 | CRW2 | HEL1 | HEL2 | HEL3 | ENGS | DOZR | WTDR | OVHD | Camp Crews |
Total Personnel | ||||
SR | ST | SR | ST | SR | SR | SR | SR | ST | SR | ST | SR | SR | |||
BIA | 1 | 1 | 15 | 42 | |||||||||||
OTHR | 1 | 2 | 16 | 25 | |||||||||||
USFS | 7 | 7 | 1 | 6 | 4 | 1 | 2 | 1 | 265 | 1 | 683 | ||||
CNTY | 2 | 0 | 0 | 1 | 2 | 1 | 81 | 142 | |||||||
LGR | 0 | 33 | 33 | ||||||||||||
NPS | 1 | 24 | 24 | ||||||||||||
PRI | 4 | 0 | 0 | 0 | 0 | 9 | 16 | 116 | 224 | ||||||
ST | 2 | 1 | 127 | 8 | 319 | ||||||||||
OES | 1 | 1 | |||||||||||||
BLM | 1 | 1 | 0 | 18 | 44 | ||||||||||
Total | 11 | 2 | 12 | 0 | 1 | 8 | 5 | 1 | 4 | 14 | 0 | 17 | 696 | 9 | 1,537 |
Total personnel by agency are listed in the first section of committed resources. | |||||
Agency | HELTK | FIXW | TRKCO | RESMD | LGTAIR |
SR | SR | SR | SR | ||
BIA | |||||
OTHR | |||||
USFS | 4 | ||||
CNTY | |||||
LGR | |||||
NPS | |||||
PRI | 0 | 2 | |||
ST | |||||
OES | |||||
BLM | |||||
Total | 0 | 4 | 0 | 2 | 0 |
46: Cooperating and Assisting Agencies Not Listed
Above: Ventura County, CHP, LA County Sheriff, Cal Trans, LACO DWP, Hungry Valley St. Park, Pyramid Lake, LACO Police, LACO Fire Department,VNC Sheriff, CA Dept. of Water Resources,USFWS, American Red Cross, Kern County, O.E.S., CDF. Other includes 2 WXW and 27 DDQ personnel. |
Approval Information |
47: Prepared by: Rick Leuck |
48: Approved by: Mike Dietrich and G Custer |
49: Sent to:FAMWEB by:
Rick Leuck SITL Date: 10/02/2006 Time: 1800 |