Incident Status Summary (ICS-209)

1: Date
10/27/2007
2: Time
1400
3: Initial   |   Update   |   Final
             |                |    XX
4: Incident Number
CA-ANF-4306
5: Incident Name
RANCH
6: Incident Kind
Wildland Fire
7: Start Date    Time
10/20/2007 2142
8: Cause
Under Investigation
9: Incident Commander
Jeanne Pincha-Tulley
10: Incident Command
Organization
Type 1 Team
11: State-Unit
CA-ANF
12: County
Los Angeles
13: Latitude and Longitude
Lat:
34° 34´ 23"  Long: 118° 41´ 43"
Ownership: CA-ANF
14: Short Location Description (in reference to nearest town):
6 miles North of Castaic, CA
Current Situation
15: Size/Area
Involved
58,401 ACRES
16: % Contained
or MMA
97 Percent
17: Expected Containment
Date:
10/30/2007
18: Line to Build
0
Miles
19: Estimated Costs
to Date
$9,000,000
20: Declared Controlled
Date:

Time:
21: Injuries this
Reporting Period:
22: Injuries
to Date:
23: Fatalities 24: Structure Information
0 0  0 Type of Structure # Threatened # Damaged # Destroyed
25: Threat to Human Life/Safety:
Evacuation(s) in progress ----

No evacuation(s) imminent --

Potential future threat --------

No likely threat ---------------
XX
Residence 0 0 1
Commercial Property 0 0 0
Outbuilding/Other 0 2 9
26: Communities/Critical Infrastructure Threatened (in 12, 24, 48 and 72 hour time frames):
12 hours:

24 hours:

48 hours:

72 hours:
27: Critical Resource Needs(kind & amount, in priority order in 12, 24, 48, and 72 hour time frames):
12 hours:

24 hours:

48 hours:

72 hours:
28: Major problems and concerns (control problems, social/political/economic concerns or impacts, etc.) Relate critical resources needs identified above to the Incident Action Plan.
Critically low live fuel moisture and steep inaccessible terrain.
29: Natural and Cultural Resources to be protected (kind(s) and value/significance):
Condor Sanctuary, Sespe Wilderness Area, Hopper Canyon National Wildlife Refuge. Threatened and endangered species including: California condor, Arroyo Toad, Mountain Red Legged Frog, Southwest Pond Turtle. Extensive cultural resources.
30: Current Weather Conditions
Wind Speed:
8G23 mph    Temperature: 68
Wind Direction: E       Relative Humidity: 26
31: Fuels/Materials Involved: 4 Chaparral (6 Feet)
Heavy brush, grass, oak woodland.
32: Today's observed fire behavior (leave blank for non-fire events):
Successful suppression efforts prevented fire spread on the entire perimeter. Minimal fire activity was observed within the entire fire area.
33: Significant events today (closures, evacuations, significant progress made, etc.):
Resources continued patrolling and mopping up the perimeter of the fire.
Outlook
34: Estimated Control
Date and Time:
12/31/2007 2359
35: Projected Final Size:
58401
36: Estimated Final Cost:
$9,000,000
37: Actions planned for next operational period:
Patrol and mop up as needed.
38: Projected incident movement/spread during next operational period (in 12, 24, 48, and 72 hour time frames):

12 hours:
No movement expected on the entire fire due to successful suppression efforts.
24 hours:
No movement expected on the entire fire due to successful suppression efforts.
48 hours:
No movement expected on the entire fire due to successful suppression efforts.
72 hours:
No movement expected on the entire fire due to successful suppression efforts.
39: For fire incidents, describe resistance to control in terms of:
1. Growth Potential - Low
2. Difficulty of Terrain - Extreme
40: Given the current constraints, when will the chosen management strategy succeed?
Management strategy was successful.
41: Projected demobilization start date: 10/24/2007 0800
42: Remarks:
Management of the Ranch Fire transferred out of Unified Command at 0600 hours today. Management of the Ranch Fire will transition to a local Type 3 organization (IC Mike Ryan) today at 1800 hours. Containment will remain at 97% due to natural barriers not requiring cold trailing. As of 1400 on 10/27 acreage breakdown by Direct Protection Area: National Forest (27,166), CDF State Responsibility (28,063), BLM (1,270) Fish and Wildlife Service (1,902).
43: Committed Resources (Supplemental Committed Resources follow the first block)
Agency CRW1 CRW2 HEL1 HEL2 HEL3 ENGS DOZR WTDR OVHD Camp
Crews
Total
Personnel
SR ST SR ST SR SR SR SR ST SR ST SR SR
USFS 1 0 1 0 1 1 1   1 0 0   5 0 72
CNTY                   0     1   1
Total 1 0 1 0 1 1 1 0 1 0 0 0 6 0 73
Total personnel by agency are listed in the first section of committed resources.
Agency HELTK FIXW TRKCO RESMD LGTAIR
SR SR SR SR
USFS   0 0 0 0
CNTY 0 0 0 0 0
Total 0 0 0 0 0
44: Cooperating and Assisting Agencies Not Listed Above:
Approval Information
45: Prepared by:
G. Black SITL
46: Approved by:
Jeanne Pincha-Tulley
47: Sent to:South Ops by: G. Black
Date:
10/27/2007 Time: 1400