10000576,Colville,Three Rivers,T32N R42E S30,3,Stevens,2,3,1846,130,355,Quartzite 73,5,05/19/2010,05/04/2008,01/01/1999,35,0,0,0.3,1.4,1,1.1,0.9,0.8,0,0,0,0,0.4,3,4300,48.238166667,-117.5623611,Y,100001427,05/19/2010,1100,650,130,300,N,,01,01/01/1999,0,0,0,0,,,0,0,0,0,0,0,, 10000576,Colville,Three Rivers,T32N R42E S30,3,Stevens,2,3,1846,130,355,Quartzite 73,5,05/20/2010,05/04/2008,01/01/1999,35,0,0,0.3,1.4,1,1.1,0.9,0.8,0,0,0,0,0.4,3,4300,48.238166667,-117.5623611,Y,100001428,05/20/2010,1100,650,130,300,N,,01,01/01/1999,0,0,0,0,,,0,0,0,0,0,0,, 10000576,Colville,Three Rivers,T32N R42E S30,3,Stevens,2,3,1846,130,355,Quartzite 73,5,05/21/2010,05/04/2008,01/01/1999,35,0,0,0.3,1.4,1,1.1,0.9,0.8,0,0,0,0,0.4,3,4300,48.238166667,-117.5623611,Y,100001429,05/21/2010,1100,650,130,300,N,,01,01/01/1999,0,0,0,0,,,0,0,0,0,0,0,, 10000575,Okanogan-Wenatchee,Methow Valley,T35N R20E S2,1,Okanogan,1,3,5018,128,328,Fawn 18/45,5,05/17/2010,07/01/2009,04/01/2010,25,0,0,1.8,1.8,3.7,3.3,1.5,0.2,0,0,0,0.9,0.2,3,3600,48.5623,-120.301,Y,100001425,05/17/2010,0830,1920,128,600,N,Second priority after Deer RX ,3,05/17/2010,0,0,0,1,1,,0,0,0,0,0,0,, 10000568,Okanogan-Wenatchee,Methow Valley,T34N R20E S23,1,Okanogan,1,3,5225,150,568,Leecher Thin 4/17,5,05/15/2010,07/15/2004,04/01/2010,30,0,0,0.7,2.2,3.4,2.9,0,0,0,0,0,0.1,0.2,3,4000,48.2238,-119.9655,Y,100001413,05/15/2010,0830,1350,150,600,Y,THIS IS A 2DAY BURN REQUEST This unit has a road through most of the middle could extend to the opposite flank to cut off if needed ,02,05/15/2010,0,0,0,1,1,,0,0,0,0,0,0,, 10000571,Okanogan-Wenatchee,Methow Valley,T34N R20E S23,1,Okanogan,2,3,13188,539,942,Deer Creek,5,05/16/2010,03/04/2003,04/01/2010,50,0,0,0,1,3,2,1,0,0,0,0,0.9,0.5,3,3800,48.4247,-120.32,Y,100001423,05/16/2010,0830,7546,539,600,Y,THIS IS A MULTIDAY BURN REQUEST Wed like 2 days to complete this project Unit has internal fireline can break project into 2 days of ignition with 362 acres day 1 5068 tons and 177 acres day 2 2478 tons At the very least would like to complete the 362 acres initially We should be able to complete 539 acres in one day Thanks for your consideration ,02,05/16/2010,0,0,0,1,1,,0,0,0,0,0,0,, 10000571,Okanogan-Wenatchee,Methow Valley,T34N R20E S23,1,Okanogan,2,3,13188,539,942,Deer Creek,5,05/17/2010,03/04/2003,04/01/2010,50,0,0,0,1,3,2,1,0,0,0,0,0.9,0.5,3,3800,48.4247,-120.32,Y,100001424,05/17/2010,0830,7546,539,600,Y,THIS IS A MULTIDAY BURN REQUEST Wed like 2 days to complete this project Unit has internal fireline can break project into 2 days of ignition with 362 acres day 1 5068 tons and 177 acres day 2 2478 tons At the very least would like to complete the 362 acres initially We should be able to complete 539 acres in one day Thanks for your consideration ,02,05/17/2010,0,0,0,1,1,,0,0,0,0,0,0,, 10000573,Okanogan-Wenatchee,Methow Valley,T34N R20E S21,1,Okanogan,1,3,4420,57,257,TPR 7/72,5,05/12/2010,01/15/2004,04/01/2010,30,0,0,1,1,1.8,3.2,1.5,2,0,0,0,0.6,0.5,3,3400,48.42704,-120.3492,Y,100001359,05/12/2010,0830,969,57,600,N,THIS unit is 2nd priority after Deer If none of Deer is approved wed like to complete this unit in 1 day Thanks for your work,3,05/12/2010,0940,440,50,1,1,,2,5,10,28,0,0,Smoke lofted to about 4000 ASL moving to NNW in Little Bridge Cr drainage At last observation at 1700 smoke started dropping into this drainage Smoke levels next morning at 0900 were light with no visible inversion layer , 10000589,Little Pend Orielle NWR,Idaho Panhandle NF,T34N R40E S20,1,Stevens,1,3,1242,100,300,Slide Creek,3,05/13/2010,01/01/1999,02/15/2010,20,0,0,2.34,0.7,0.7,0.2,0.2,0,0.5,0,0.5,0.3,1,3,3000,48.4248,-117.7863,Y,100001400,05/13/2010,1100,400,100,240,N,,01,05/13/2010,1130,380,109,1,1,,3,20,8,18,100,0,Burned most of the litter layer and 1 and 10 hour fuels consumed fairly well Depending on aspect larger fuels that were present were able to burn Good SW winds all day dispersed smoke onto the Refuge and away from neighbors , 10000570,Okanogan-Wenatchee,Methow Valley,T30N R22E S17,1,Okanogan,2,3,2223,75,327,East Douglas,5,05/14/2010,01/01/1999,04/01/2010,50,0,0,0.4,0.9,1.2,1.6,0,0,0,0,0,0.3,0.2,3,3400,48.1008,-120.0915,Y,100001414,05/14/2010,1000,225,75,600,N,Remaining acreage has fuel loading with grassesneedle cast and very light woody debris for a total of 3 tonsacre ,5,05/14/2001,1030,240,70,1,1,,3,7,8,37,0,0,Unit completed with good consumption today Smoke drifted lightly to NNE with some settling into McFarland Cr No smoke visible in upper valley bottom above Carlton , 10000611,Okanogan-Wenatchee,Tonasket,T38N R29E S3,3,Okanogan,1,3,174,26,26,Redmill 214,5,05/12/2010,06/15/2005,03/15/2010,5,0,0,0.2,2.5,2.2,2,0,0,0,0,0.2,0.5,0.2,2,4500,48.81486,-119.15850,N,100001353,05/12/2010,1100,174,26,120,N,,05,05/12/2010,1215,160,15,1,1,,2,4,13,11,120,0,Smoke rose to approximately 2000 ft and dispersed travelling out to the south southwest,