1: Date 05/19/2008 |
2: Time 1700 |
3: Initial | Update |
Final | XX | |
4: Incident
Number FL-EVP-08025 |
5: Incident Name Mustang Corner |
6: Incident Kind Wildland Fire (Full Suppression/Perimeter Control) |
7: Start Date
Time 05/14/2008 0831 |
8: Cause Human |
9: Incident Commander M. Quesinberry |
10: Incident
Command Organization Type 1 Team |
11:
State-Unit FL-EVP |
12: County Miami-Dade |
13: Latitude and Longitude Lat: 25° 33´ 51" Long: 80° 34´ 30" Ownership: FL-EVP |
14: Short Location Description (in reference to
nearest town): 10 miles NW of Homestead, FL |
15:
Size/Area Involved 35,896 ACRES |
16: % Contained or MMA 30 Percent |
17: Expected Containment Date: |
18: Line to Build |
19: Estimated Costs to Date $1,094,747 |
20: Declared Controlled Date: Time: |
21: Injuries this Reporting Period: |
22: Injuries to Date: |
23: Fatalities | 24: Structure Information | |||
0 | 0 | 0 | Type of Structure | # Threatened | # Damaged | # Destroyed |
25: Threat to Human
Life/Safety: Evacuation(s) in progress ---- XX No evacuation(s) imminent -- Potential future threat -------- No likely threat --------------- |
Residence | |||||
Commercial Property | ||||||
Outbuilding/Other |
26: Projected incident movement/spread 12, 24, 48,
and 72 hour time frames: 12 hours: Wind-driven spread to NE 24 hours: Wind-driven spread to NE 48 hours: Wind-driven spread to NE 72 hours: Wind-driven spread to N and NE |
27: Values at Risk: include communities, critical
infrastructure, natural and cultural resources in 12, 24, 48 and 72 hour
time frames: 12 hours: Critical habitat for Cape Sable Seaside Sparrow, sensitive cultural sites, and residential and commercial infrastructure near Tamiami Trail (Hwy 41) and Hwy 997 24 hours: Critical habitat for Cape Sable Seaside Sparrow, sensitive cultural sites, and residential and commercial infrastructure near Tamiami Trail (Hwy 41) and Hwy 997 48 hours: Critical habitat for Cape Sable Seaside Sparrow, sensitive cultural sites, and residential and commercial infrastructure near Tamiami Trail (Hwy 41) and Hwy 997 72 hours: Critical habitat for Cape Sable Seaside Sparrow, sensitive cultural sites, and residential and commercial infrastructure near Tamiami Trail (Hwy 41) and Hwy 997 |
28: Critical Resource Needs (amount, type, kind and
number of operational periods () in priority order in 12, 24, 48, and 72
hour time frames): 12 hours: 24 hours: 48 hours: 72 hours: |
29: Major problems and concerns (control problems,
social/political/economic concerns or impacts, etc.) Relate critical
resources needs identified above to the Incident Action
Plan. 1. Critical habitat for the Cape Sable Seaside Sparrow and sensitive cultural sites. 2. Fire in WUI areas. 3. Dense smoke and fog advisory until 5/20/08 at 1000 hours. |
30: Observed Weather for Current
Operational Period Peak Gusts (mph): 20 Max. Temperature: 93 Wind Direction: WSW Min. Relative Humidity: 52 |
31: Fuels/Materials Involved:
3 Tall Grass (2.5 Feet) FM 8 |
32: Today's observed fire behavior (leave blank for
non-fire events): Wind-driven flame length at 10-20 feet in grass fuels and up to 40 feet NNIS. ROS 100 ch/hr in sustained winds. Spotting up to 0.2 miles. |
33: Significant events today (closures, evacuations,
significant progress made, etc.): Florida Dept of Corrections voluntary evacuation of 2 prison institutions. |
34: Forecasted Weather for next Operational
Period Wind Speed (mph): 11G21 Temperature: 92 Wind Direction: SW Relative Humidity: 46 |
35: Estimated Control Date and Time: |
36: Projected Final Size: |
37: Estimated Final
Cost: |
38: Actions planned for next operational
period: Div A & B continue supression with aerial resources and mop up from established anchor points. Div Z continue mop up from anchor points with one foot in the black. |
39: For fire incidents, describe resistance to control in terms of: |
1. Growth Potential - High |
2. Difficulty of Terrain - Medium |
40: Given the current constraints, when will the
chosen management strategy succeed? |
41: Projected demobilization start date: |
42:
Remarks: |
43: Committed Resources (Supplemental Committed Resources follow the first block) |
Agency | CRW1 | CRW2 | HEL1 | HEL2 | HEL3 | ENGS | DOZR | WTDR | OVHD | Camp Crews |
Total Personnel | ||||
SR | ST | SR | ST | SR | SR | SR | SR | ST | SR | ST | SR | SR | |||
PRI | 2 | 2 | 2 | 4 | 8 | ||||||||||
BLM | 1 | 1 | |||||||||||||
ST | 6 | 6 | |||||||||||||
BIA | 1 | 3 | 24 | ||||||||||||
NPS | 1 | 4 | 43 | 44 | |||||||||||
WXW | 2 | 2 | |||||||||||||
FWS | 4 | 4 | |||||||||||||
USFS | 2 | 2 | 67 | 145 | |||||||||||
Total | 2 | 0 | 3 | 0 | 2 | 2 | 3 | 8 | 0 | 0 | 0 | 0 | 126 | 0 | 234 |
Total personnel by agency are listed in the first section of committed resources. | ||||||||
Agency | C215 | C415 | BMDR | TPL1 | TPL2 | TPL3 | TPL4 | VANS |
SR | SR | SR | SR | SR | SR | SR | SR | |
PRI | ||||||||
BLM | ||||||||
ST | 3 | |||||||
BIA | ||||||||
NPS | ||||||||
WXW | ||||||||
FWS | ||||||||
USFS | ||||||||
Total | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 |
44: Cooperating and Assisting Agencies Not Listed
Above: Florida Division of Forestry, Florida Dept Corrections |
45: Prepared by: J. Andre SITL |
46: Approved by: M. Quesinberry IC |
47: Sent to:SACC by:
J. Andre Date: 05/19/2008 Time: 1800 |